Only small fire at electric transformer and leaking from tipping waste water barrel on severe earthquake, is a very good standard. They have to improve standard further but this is not so bad. Only bad thing is delayed reporting to regulatory agency. The delay is less than half a day but still should be faster in case of evacuation.
Sensational news reporting, I saw the aerial video footage of fire on news already. It was outside building and not a big fire.